Monday, October 17, 2011

Roofing material delivered

At some point today the roofing material was delivered and placed on the roof. So by the end of tomorrow we should see some good progress on the roof. After speaking with the superintendent, the rough plumbing and hvac are being held off until the roof and windows are installed. We should have the roof and windows completed by the end of the week. Even with this short delay we are still on schedule.

We made a small change today in the laundry room by rearranging the location of the washer and dryer. By doing this it should allow us to add some storage units and a counter top.


Did a little paint magic to move the w/d and added some storage in the laundry room.

Roofing material stocked on the roof.