Monday, November 7, 2011

Over the weekend

Friday we didn't stop by the house because we took the kids over to Exploration Place to check out the new castle right after I got off work. Saturday we stopped by to find the siders working so we left them alone and didn't take any pictures. We even stopped by Sunday after we dropped Winter off at a friends house to see what got done and low and behold the siders were there again. I didn't make it over to the house today since it was raining hard all day. It is also suppose to rain all day tomorrow so we will have to wait and see what got, done if anything. Hard to imagine anything got done since we haven't signed off on the plumbing or electrical selection sheets. I am in no rush at this point so we will just wait on Nies.

Weston playing around in our future kitchen. The red and blue pipes you see are the new water lines for the kitchen sink in the island. The yellow wire on the floor is electrical lines for the dishwasher, garbage disposal and outlets in the island.
This is our new plumbing manifold. This is one thing that I was super excited about getting. I know it isn't anything special but man it makes it easy to shut one water souce off if you ever have to fix something. The missing lines are marked for the items in the basement. I need to do is run a couple of lines over to the basement bath and bar and the whole house will be plumbed.
Nothing like buying a new shower/tub enclosure to have it delivered to the house looking like this. I am sure it will be fine but if it isn't I will have a picture to show what it looked like before being installed. This happens to be one of those items I really don't care much about since most people will not see it. This one is actually going in the basement bathroom. The Jack n Jill bath will have a matching shower/tub installed. This is one thing we didn't think about until after framing but if we decide to build another house we will buy the taller and wider unit.

No comments:

Post a Comment