Friday a few trades came by and got some work done on the house. The biggest thing was the siders finished up back side of the house which completed the siding. The low voltage guys decided to install cable, cat5 and phone even though we hadn't even told them where to install them. So once again they get to come back and reinstall the cables to our liking. The plumbers installed the 2 showers and even put in the valves for our master shower. Not sure we like it at this time.
This week it should be clear and dry which means the masons will start on the brick work. I can't wait to see the brick up on the front of the house. The material has been sitting in the front yard for a week now. Lisa and I still have interior items to decide on. Mainly the flooring and tile needs to be roughly picked out by the end of the week.
Back side of the house finished.
Jack n Jill bath shower installed.
Master shower with the two valves installed. Main shower head is directly in the center of the shower with an additional hand held shower to the right. Not what we envisioned but I think it will work out well.
The house looks magnificent with those sidings. It’s great to see that the sidings are installed in a very professional way. And it’s a good thing that your cables were fixed right away, saving you the trouble of readjusting things around. Though the house isn’t polished yet, it sure shows that it will be a beauty.
ReplyDeleteGalliena Gornet