The tile guys came back today to work on the fireplace. All they lack is some grouting and then it will be done. Appliances were installed today besides the refrigerator which will go in a day or two before closing. Some of the cabinet hardware was installed today. They told us that this coming Wednesday they are going to have the carpet installed. If that is the case we may end up closing the first week in March.
Fireplace stone is up but still needs a little grout.
Slide in stove.
Microwave.
Dishwasher installed in island.
Drawer pulls and door knobs installed.
Pantry uses a motion light switch. The kids thought it was pretty cool.