Wednesday, February 15, 2012

Day 3 of lighting

I was wrong in thinking it was only going to be one more day before all the lights were installed. He did get the bathroom lights up and one cabinet outlet installed today. The masons came back and installed our address stone and finished cleaning up their left over material that was left on site. I forgot to write about the laundry room floor which was installed over the weekend.

Laundry room floor finished.
Weston's light installed.
Winter's light installed.
Dishwasher waiting to be installed.
Hand held shower was installed today. Still waiting on main shower head to be replaced.
Half bath light up.
Kitchen outlet installed on side of cabinet. We got pretty lucky and found some pre-stained outlet covers that matched our cabinets.
Address block installed and a picture of one of the garage lights.
A up close picture of the dining room light.