Lots of little stuff happened today. The master shower floor was grouted but it still needs a final cleaning before it is finished. The raised hearth was built for the living room fireplace. Most of the door hardware was installed and they even got the trash bin cabinet fixed today.
Door hardware installed.
Trash bin is now fixed.
Raised hearth built and ready for some stone.
Shower floor grouted. Once cleaned we might see more of the river rock that we used.
No comments:
Post a Comment