Over the weekend we had some new tile installed. The tile guy came back to install the correct floor tile and it turned out great. He didn't have enough grout to finish the shower floor but he did finish the kid's bathrooms. I got back into the DIY scene and installed our glass tile black splash in the kitchen. Lisa is super happy with how it turned out. I still have some tile left to install but will try and get those finished up this weekend. Eventually I will grout and be done with this project.
Today the electrician came back to start installing the lights. He installed all the "boob" lights and the master bedroom fan. It shouldn't take but one more day to get the rest of the fans and lights installed. We should have carpet and appliances coming soon and then we should be close to being finished.
Matser closet finished with lights installed. This is actually my side of the closet.
Weston's tile finished in his bathroom.
Winter's tile finished.
The shower floor is down but still needs to be grouted. We finally got the correct tile and boy does it look good. We thought we would give this river rock a shot and we are both super happy with it.
Kitchen back splash above the stove. Both of us are amazed how it turned out. This was my first time laying glass tile and so far it has been pretty easy.
Back splash below microwave. Only need to cut one more tile and this area is done.
One of many "boob" lights installed.
Master bedroom fan installed.
No comments:
Post a Comment